Sunday 27 April 2014

CE6713 ESTIMATION AND QUANTITY SURVEYING SYLLABUS | ANNA UNIVERSITY REGULATION 2013 CIVIL 7TH SEM CE6713 SYLLABUS



CE6713 ESTIMATION AND QUANTITY SURVEYING SYLLABUS | ANNA UNIVERSITY REGULATION 2013 CIVIL 7TH SEM CE6713 SYLLABUS

CE6713 ESTIMATION AND QUANTITY SURVEYING  SYLLABUS | ANNA UNIVERSITY REGULATION 2013 CE6713 SYLLABUS 
CE6713  ESTIMATION AND QUANTITY SURVEYING                                     SYLLABUS | ANNA UNIVERSITY REGULATION 2013 CE6713 SYLLABUS
CE6713 ESTIMATION AND QUANTITY SURVEYING  SYLLABUS | ANNA UNIVERSITY REGULATION 2013 CE6713 SYLLABUS 


CE6713 ESTIMATION AND QUANTITY SURVEYING L T P C
0 1 3 2



OBJECTIVES:
? To provide the student with the ability to estimate the quantities of item of works involved in
buildings, water supply and sanitary works, road works and irrigation works, and also to
equip the student with the ability to do rate analysis, valuation of properties and preparation
of reports for estimation of various items.


UNIT I ESTIMATE OF BUILDINGS 11
Load bearing and framed structures – Calculation of quantities of brick work, RCC, PCC,
Plastering, white washing, colour washing and painting / varnishing for shops, rooms, residential
building with flat and pitched roof – Various types of arches – Calculation of brick work and RCC
works in arches – Estimate of joineries for panelled and glazed doors, windows, ventilators,
handrails etc.


UNIT II ESTIMATE OF OTHER STRUCTURES 10
Estimating of septic tank, soak pit – sanitary and water supply installations – water supply pipe line
– sewer line – tube well – open well – estimate of bituminous and cement concrete roads –
estimate of retaining walls – culverts – estimating of irrigation works – aqueduct, syphon, fall.


UNIT III SPECIFICATION AND TENDERS 8
Data – Schedule of rates – Analysis of rates – Specifications – sources – Preparation of detailed
and general specifications – Tenders – TTT Act – e-tender – Preparation of Tender Notice and 69

Document – Contracts – Types of contracts – Drafting of contract documents – Arbitration and
legal requirements.


UNIT IV VALUATION 8
Necessity – Basics of value engineering – Capitalised value – Depreciation – Escalation – Value of
building – Calculation of Standard rent – Mortgage – Lease


UNIT V REPORT PREPARATION 8
Principles for report preparation – report on estimate of residential building – Culvert – Roads –
Water supply and sanitary installations – Tube wells – Open wells.


TOTAL (T:15+P:45): 60 PERIODS

OUTCOMES:
? The student shall be able to estimate the material quantities, prepare a bill of quantities,
make specifications and prepare tender documents. Student shall be able to prepare value
estimates.


TEXT BOOKS:
1. Dutta, B.N., "Estimating and Costing in Civil Engineering", UBS Publishers & Distributors
Pvt. Ltd., 2003
2. Kohli, D.D and Kohli, R.C., "A Text Book of Estimating and Costing (Civil)", S.Chand &
Company Ltd., 2004



REFERENCES:
1. PWD Data Book.
2. Tamilnadu Transparencies in Tender Act, 1998
3. Arbitration and Conciliation Act, 1996
4. Standard Bid Evaluation Form, Procurement of Goods or Works, The World Bank, April
1996.



Tags : 
Anna University Regulation 2013 Civil 7th Sem Syllabus,
Anna University Regulation 2013 CE6713 syllabus ,
Anna University Civil 7th sem Regulation 2013 Syllabus ,
CE6713 regulation 2013 syllabus,
CE6713 EQ SURVEYING regulation 2013 syllabus,
regulation 2013  CE6713 syllabus,
R-2013 Civil 7th sem CE6713 syllabus,
R-2013 Civil 7th CE6713 EQ SURVEYING Syllabus, 
Anna University r-2013 Civil 7th CE6713 ESTIMATION AND QUANTITY SURVEYING syllabus ,
CE6713 ESTIMATION AND QUANTITY SURVEYING R 2013 Syllabus ,
Anna University Syllabus Regulation 2013, 
Regulation 2013 Syllabus ,
Regulation 2013  Civil 7th Semester Syllabus
Regulation 2013 Syllabus anna university,
Regulation 2013 ESTIMATION AND QUANTITY SURVEYING Syllabus Anna University,
B.E Civil 7th Semester CE6713 Syllabus 2013 Regulation,




No comments:

Post a Comment